| 1. | 5 scope change control ? controlling changes to project scope 范围变更控制控制项目范围的变更。 |
| 2. | Global power - objects scope changes 全局的电源符号错误 |
| 3. | Will have their scope changed from )的范围将从 |
| 4. | Business scope changing doesn ' t mean the change of the managing mechanism 经营?围的变化并不代表经营机制的转换。 |
| 5. | The original approved plan for a project , a work package , or an activity , plus or minus approved scope changes 最初的批准的计划(对于项目、工作包或活动而言)加上或减去批准的范围更改。 |
| 6. | A good design can help to avoid it , but even the best designs can t cover every contingency or scope change 一个好的设计可以帮助避开这一点,但即便是最好的设计也无法应对所有可能的情况或作用域变化。 |
| 7. | Prepare project budgets and scope changes , track projected costs , identify potential problems , ensure that projects are delivered to budget , on time , to required quality standards and to the highest levels of safe working 准备工程预算和范围改变,跟踪工程成本,确定潜在问题,确保工程符合预算、按时、符合质量标准、以及高安全的工作施工。 |
| 8. | Currently , china ' s science and technology have been improved rapidly with many new products replacing unadvanced ones . enterprises whose technology and business scope change little will have limited competitiveness and are even hard to survive 在这种情况下,每年技术和规模都没有什么变化的企业,不久就会在与其他的企业的竞争中处于不利的地位,甚至不能生存。 |